Finished?!
After the painting was complete,
it was time to photograph!
Those of you following the project,
will realize that today, June 7th, is One year, and one day from
the day that I started the project.
Yes, this was a quick build kit, which helped with out doubt.
There were maybe three months that
took a lot of time away from the building, but the rest of the time
was good concentrated work.
Time spent building this project
was approximately 540 hours from start to first flight.
316 hours on the aircraft's structure
(fuse 106, Landing Gear and Rigging
101, Wings 109)
77 hours on the engine
147 on covering and paint
I am satisfied with the product,
and am enjoying flying the airplane.
Items of attention remaining are
carburation, oil temps, and stabilizer trim.
I'm sorry for the size of the picture
files, but I wanted them to be worth viewing and studying.
E
mail me
View from the front. Here's the sum of all efforts
Looking down from the roof
Right side view
Back to
Youngster page
Home
E mail me here!
jehardy@nortexinfo.net